Process

What the work
generally involves.

Every sewer line is different, but trenchless projects tend to follow a similar arc. Here's what you can reasonably expect — described in plain terms.

Project steps

Assessment & camera inspection

A camera inspection identifies the pipe material, the extent of damage, and whether trenchless methods are viable. This step determines the right approach — bursting, lining, or replacement.

Access planning

Trenchless work requires small entry and exit points rather than a continuous trench. We plan those locations to minimize impact on your property and landscaping.

Repair or replacement

Depending on the diagnosis, we either rehabilitate the existing pipe with a structural liner or pull a new pipe through the old path using pipe bursting. The exact method depends on pipe condition, material, and site factors.

Verification & cleanup

After the work is complete, a final camera inspection verifies the result. Access pits are backfilled, and the site is restored as closely as possible to its original condition.

A note on timelines: The exact duration depends on line length, method, and site conditions. A camera inspection and assessment is the only reliable way to estimate the work involved.

Have questions about
the process?

Call to describe what you're seeing and ask anything. We'll explain what applies to your situation — without sales pressure.